Supply The Cost Effective Submeisible Slurry Pump

The DC Mud Cleaner is the second stage and the third stage of the solids control equipment. It is a combination of a desander, desilter and underflow shaker shaker.
Compared with the more traditional separate versions of having a desander and desilter, the mud cleaner delivers a higher level of cleaning function.

SONY DSC

SONY DSC

Mud cleaners consist of a desilter mounted over a fine mesh screen of 150 or 240 mesh. The desilter underflow is treated mechanically by the fine 150-240 mesh screen which allows the liquid phase and any barites present to pass back into the circulating tank while the drilled solids above 75 microns (for 200 mesh screen) are removed.

SONY DSC

SONY DSC

Main configuration for a standard Mud cleaners:
Polyurethane Material hydrocyclone for long life
Removable hydrocyclone assembly for adjust to be a shale shaker.
Patent shaker deck angle adjustable while working, mechanical deck angle adjustment with reliable performance.
Patent tighten rubber sealing for mud cleaner shaker deck and screen for fine screen
Shaker bottom deck made from Stainless Steel for long service life.
Heat treatment on complete shaker deck for High G force operation.
Pretensioned Shaker screen for fast screen replacement.
Famous Brand Vibration Motors : IEC Ex, ATEX and UL Certified mud cleaner

To be as a professional manufacturer of drilling mud cleaning system. DC Solid control can provide all kinds capacity mud cleaner and related equipment, such as shale shaker, desander, desilter, centrifuge, centrifugal pumps, mud agitator and ect. If you have anyother requirements please feel free to contact me.

Mud shale shaker used for HDD project

DC supply HDD shale shaker to match HDD drill rig and mud pump for drilling cuttings separation. HDD shale shaker is slightly different design with oilfield shaker because of mud conditions and transport difference.

SONY DSC

SONY DSC

Usually the HDD shaker use 3 decks shaker mostly for 500GPM or higher mud flow capacity because of shorter deck will allow shaker stay on shaker tank while inland transport without disassemble. But oilfield shaker normally use 3 decks or 4 decks shale shaker with buffer box back design to allow mud over flow to reduce mud speed but longer shaker decks which will be disassemble while inland transport.

SONY DSC

SONY DSC

The basic design consists of large, flat sheets of wire mesh screens or sieves of various mesh sizes that shale shakes or vibrates the drill cuttings, commonly shale shaker, across and off of the screens as the drilling fluid flows through them and back into the drilling fluids processing system, often called a mud system.

In today, the amount of R&D aimed at HDD drilling fluids is considered a rounding error in the oligopoly of drilling fluid manufacturers. However, the trends strongly suggest that the future of HDD drilling will follow a similar evolution as experienced by the traditional oil and gas industry.

Compact DCMC250GPM Mud recycling System Used for Thailand HDD site

Recycling and reusing drilling fluids is becoming increasingly common on jobs with mid-size horizontal directional drill (HDD) projects where previously that practice was uncommon.

HDD mud system

Recent days. DC Solid control company shipped a set of DCMC250GPM mud recycling system used for Thailand HDD drilling site. The mud system is engineer designed to clean, recycle and mixing drilling mud in one mud tank package. The flow capacity is 250gpm + with shaker operating at 40 mesh screens and mud density 1.2g/cm3. It removes undesired drilled cuttings down to 12 microns with 4″ desilter cones. Compact design and small foot print allows it to be easily moved and transported .

mud system

Mud Cleaning System Configuration
1 x mud cleaner (2 x 10″ desander, 1 x dewatering shaker screen)
1 x transfer pump,
1 x mixing pump, 1 x mixing mud hopper
cat walk, handrails, valves etc.
electric control system
All the equipment and parts are configured on one mud tank (2 x 1.8 x 15m)

DC Solidc control design and manufacture compact drilling mud system from 200GPM upto 2000GPM for HDD, water well drilling etc. Customized ! Compact ! Module-Built!

Steel frame 630x1250mm shaler screen shipped to India

Steel Frame Shale Shaker Screen are mostly applied to the shale shakers with wedge fastening equipment. The screen frames adopt that high-strength square steel tube welded to multi-ribbed construction. They are sturdy and reliable. We can supply steel frame screens with mesh sizes ranging from 20 to 250.

shaker screen

Now we have finished the production of the 800 pcs steel frame shaker screens and prepared to shipped to India drilling site used for King cobra shale shakers. Replacement shaker screen for King Cobra combine proven mesh combinations with diamond plate to improve separation efficiency of the shaker, in the meanwhile extend screen life. These screens are engineered to meet the exact design specifications of the Brandt’s shale shaker and can be installed directly on the unit using the block wedges. Replacement screens are available in a various of mesh combinations to best suit the request of the drilling application.

screens

There are many different types of shale shaker screens available on the market today, each with different types of weaving to create the screen and different sizes of mesh. Ultimately choosing the best screen comes down to choosing the finest mesh you possibly can that doesn’t result in drilling liquid being lost from the front of the shaker screen that match the type of shaker equipment you are using.

If you are looking for replacement shaker screens for your drilling equipment, you may want to consider DC company Separation products. All of the shale shaker screens that we offer are high quality but extremely affordable. With a wide range of mesh designs and customizable screen options available, we can provide the perfect screen for your equipment at a price you can afford.